• Service Overview
  • About Seller
  • Reviews

βœ” Uninstallation Process

βœ” Unit Removal – Carefully detach indoor & outdoor units without damage

β†’ Preserve all components (brackets, pipes, wiring)

β†’ Protect walls/floors during removal

βœ” Electrical Disconnect – Turn off power and remove wiring safely

β†’ Label wires for easy reinstallation

β†’ Insulate exposed wire ends

βœ” Refrigerant Recovery – Extract remaining gas (EPA-approved)

β†’ Store gas properly for reuse

β†’ Zero environmental leakage

βœ” Site Cleanup – Leave space ready for new unit

β†’ Remove old mounting hardware

β†’ Patch wall holes (optional)


βœ” Installation Process

βœ” Unit Placement – Install indoor and outdoor units with proper spacing

β†’ Level indoor unit for optimal drainage

β†’ Outdoor unit with 12+ inches airflow clearance

βœ” Electrical Setup – Safe wiring with dedicated power

β†’ New circuit breaker if needed

β†’ Waterproof connections

βœ” Piping Work – Connect and insulate copper pipes

β†’ Pressure-test for leaks

β†’ Vacuum-seal refrigerant lines

βœ” Testing – Verify perfect operation

β†’ Check cooling performance

β†’ Adjust airflow direction


Products We Used


πŸ”§ Uninstallation Products

βœ” 1. Sealing & Protection

β†’ Copper Pipe Caps – Airtight seal for refrigerant lines

β†’ PVC Drain Plugs – Prevent water leakage after disconnection

β†’ Insulation Tape – Protect exposed pipe ends


βœ” 2. Gas Recovery

β†’ Refrigerant Recovery Machine – Extracts R32/R410A gas

β†’ Storage Cylinders – Holds recovered refrigerant safely


βœ” 3. Hardware Removal

β†’ Bracket Removal Tools – For stainless steel mounts

β†’ Wall Anchors – Reusable if undamaged


βœ” 4. Site Cleanup

β†’ Wall Patch Cement – Fills drill holes (optional)


πŸ”© Installation Products

βœ” 1. Mounting Hardware

β†’ New Stainless Steel Brackets – Heavy-duty support

β†’ Rubber Vibration Pads – Noise reduction


βœ” 2. Piping & Insulation

β†’ Pre-Insulated Copper Pipes – 1/4" & 3/8" sizes

β†’ Armaflex Insulation – Prevents condensation


βœ” 3. Electrical

β†’ Circuit Breaker – Dedicated 15-20A power line

β†’ Waterproof Wire Connectors


βœ” 4. Testing & Finishing

β†’ Vacuum Pump – Removes air/moisture

β†’ Leak Detection Spray – Checks connections

What You Get In This Service

no-image
Krishnan
Order Completed (1324)
  • From India
  • Seller Since 2025
  • Order Completion Rate 86%
  • Order Completed 1324

Another Service of this Seller

Explore All
Tirupati, India
Parking Area

Keep your parking space spotless and safe with our professional parking area cleaning service. We of...

Starting at β‚Ή500.00
Tirupati, India
Wash Room Lite Cleaning

1. Washroom, Basin and Tap Cleaning – Light Cleaning Scrubbing to remove the visible dirt 2. Tile a...

Starting at β‚Ή449.00
  • Package
  • β‚Ή2,625.00
Available Service Packages
  • AC Un Installation & Installation Service
1324 Order Completed